Here’s my weekly report for week 39 of 2017. In this week I have travelled to Berlin and caught up on some podcasts in doing so. I’ve also had some trouble with the RSS feeds on my blog but hopefully this is all fixed now.
Thanks to Martin Milbret I now have a replacement for my dead workstation, an HP Z600, and there will be a blog post about this new set up to come next week. Thanks also to Sýlvan and a number of others that made donations towards getting me up and running again. A breakdown of the donations and expenses can be found at the end of this post.
Debian
Two of my packages measurement-kit from OONI and python-azure-devtools used to build the Azure Python SDK (packaged as python-azure) have been accepted by ftp-master into Debian’s unstable suite.
I have also sponsored uploads for comptext, comptty, fllog, flnet and gnustep-make.
I had previously encouraged Eric Heintzmann to become a DM and I have given him DM upload privileges for the gnustep-make package as he has shown to care for the GNUstep packages well.
Bugs closed (fixed/wontfix): #8751251, #8751261, #861753, #873083
Tor Project
My Tor Project contributions this week were primarily attending the Tor Metrics meeting which I have reported on in a separate blog post.
Sustainability
I believe it is important to be clear not only about the work I have already completed but also about the sustainability of this work into the future. I plan to include a short report on the current sustainability of my work in each weekly report.
The replacement workstation arrived on Friday and is now up and running. In total I received £308.73 in donations and spent £36.89 on video adapters and £141.94 on replacement hard drives for my NAS (which includes my local Debian mirror and backups).
For the Tor Metrics meeting in Berlin, Tor Project paid my flights and accommodation and I paid only for ground transport and food myself. The total cost for ground transport during the trip was £45.92 (taxi to airport, 1 Tageskarte) and total cost for food was £23.46.
The current funds I have available for equipment, travel and other free software expenses is now £60.52. I do not believe that any hardware I rely on is looking at imminent failure.